  • Establishes certain procedures for awarding design-build contracts.
Introduced
(1/27/2016)
In Committee
(12/4/2017)
Crossed OverPassedSignedDead/Failed/Vetoed
2016-2017 Regular Session
This bill establishes the following two-phase procedure for awarding design-build contracts: (1) request for qualifications; and (2) request for proposals. The responses to the request for qualifications prepared by the contracting unit shall be used to qualify at least two, but no more than five, design-builders from which the contracting unit may solicit request for proposals for a project. The proposal submitted by a design-builder shall include a separate technical proposal, price bid, and any other information that the contracting unit deems appropriate. The bill requires the contracting unit to establish a technical review committee to evaluate and score the technical proposals submitted by the qualified design-builders in accordance with the weighted criteria established by the technical review committee. This technical proposal score shall be made public by the contracting unit, which shall also make public the sealed price bid submitted in the request for proposals by the qualified design-builder. Under the bill, the contracting unit is to award the design-build contract to the design-builder that meets or exceeds the minimum technical proposal score set by the contracting unit and has the lowest priced bid.
2nd Reading in the Assembly, Transportation and Independent Authorities
Reported out of Assembly Committee, 2nd Reading  (on 12/4/2017)
 
 
Date Chamber Action Description
12/4/2017 A Reported out of Assembly Committee, 2nd Reading
12/4/2017 Assembly Transportation and Independent Authorities Hearing (19:00 12/4/2017 )
1/27/2016 A Introduced, Referred to Assembly Transportation and Independent Authorities Committee
Date Motion Yea Nay Other
Detail 12/4/2017 Assembly Transportation and Independent Authorities Committee: Reported Favorably 8 0 5