  • NJ A2755
  • Requires developers constructing certain renewable energy generation systems to ensure that such systems would be functionally integrated to electric grid prior to commencement of construction.
Introduced
(2/8/2016)
In Committee
(2/8/2016)
Crossed OverPassedSignedDead/Failed/Vetoed
2016-2017 Regular Session
This bill would require the Board of Public Utilities ("BPU") to establish standards requiring that developers constructing grid-connected renewable energy generation systems ensure, prior to the commencement of construction or billing for related services, that such systems would be functionally integrated to the electric grid upon completion of construction. A renewable energy generation system developer may charge fees, as determined by BPU regulation, to recover reasonable costs associated with the process of making the determination of whether a completed system would be functionally integrated to the electric grid.
Telecommunications and Utilities
Introduced, Referred to Assembly Telecommunications and Utilities Committee  (on 2/8/2016)
 
 

Date Chamber Action Description
2/8/2016 A Introduced, Referred to Assembly Telecommunications and Utilities Committee
Date Motion Yea Nay Other
None specified