Bill
Bill > H3162
MA H3162
To study the feasibility reassessment of the Roxbury light-speed rail access
summary
Introduced
01/22/2019
01/22/2019
In Committee
01/22/2019
01/22/2019
Crossed Over
Passed
Dead
12/31/2020
12/31/2020
Introduced Session
191st General Court
Bill Summary
Relative to rail service throughout the Roxbury section of the city of Boston. Transportation.
AI Summary
This bill requires the Massachusetts Department of Transportation to conduct a feasibility study on establishing light rail service throughout the Roxbury section of Boston. The study will re-examine and evaluate various aspects related to the potential extension of the existing light rail line service from Boylston Station, including projected costs, operational feasibility, environmental and community impacts, funding sources, and potential economic and social benefits. The department is required to submit a report with its findings to the state legislature by March 1, 2020.
Committee Categories
Transportation and Infrastructure
Sponsors (4)
Last Action
Accompanied a study order, see H4546 (on 03/09/2020)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Document Type | Source Location |
---|---|
State Bill Page | https://malegislature.gov/Bills/191/H3162 |
Bill | https://malegislature.gov/Bills/191/H3162.pdf |
Loading...