VA HB643
VA HB643Pipeline construction; certification requirement, minimum diameter, stop work orders.
summary
Introduced
01/06/2020
01/06/2020
In Committee
02/11/2020
02/11/2020
Crossed Over
02/07/2020
02/07/2020
Passed
Dead
03/12/2020
03/12/2020
Introduced Session
2020 Regular Session
Bill Summary
Pipeline construction; certification requirement; minimum diameter; stop work orders. Reduces from 36 inches to 24 inches the minimum inside diameter of a natural gas transmission pipeline for which an individual Virginia Water Protection Permit, rather than a general permit, is required to conduct activities in wetlands or state waters or an additional upland activity certification is required to obtain a Clean Water Act Certification. The bill reduces from 15 percent to 10 percent the minimum grade of a slope on which any construction activities will trigger the requirement for such additional upland activity certification. The measure requires the Department of Environmental Quality, within five business days of the issuance of a stop work instruction, to notify the pipeline company of specific corrective measures that shall be completed and approved by the Department before any land-disturbing activity may be resumed. The bill authorizes the State Water Control Board, in addition to the Department, to issue such stop work instructions and adds requirements and restrictions on any further construction once such an instruction is issued.
AI Summary
This bill:
1. Reduces the minimum inside diameter of a natural gas transmission pipeline that requires an individual Virginia Water Protection Permit, rather than a general permit, from 36 inches to 24 inches to conduct activities in wetlands or state waters or obtain a Clean Water Act Certification.
2. Reduces the minimum grade of a slope on which construction activities will trigger the requirement for an additional upland activity certification from 15% to 10%.
3. Requires the Department of Environmental Quality to notify the pipeline company of specific corrective measures that must be completed and approved before any land-disturbing activity can resume after the issuance of a stop work order.
4. Authorizes the State Water Control Board, in addition to the Department, to issue stop work orders and adds requirements and restrictions on further construction once such an order is issued.
Committee Categories
Agriculture and Natural Resources
Sponsors (6)
Chris Hurst (D)*,
Sally Hudson (D),
Clinton Jenkins (D),
Mark Keam (D),
Sam Rasoul (D),
Ibraheem Samirah (D),
Last Action
Passed by indefinitely in Agriculture, Conservation and Natural Resources (13-Y 1-N) (on 02/18/2020)