Requires electric distribution lines to be located underground in areas affected by severe weather or natural disasters.


summary

Introduced
02/13/2020
In Committee
02/13/2020
Crossed Over
Passed
Dead
01/11/2022

Introduced Session

2020-2021 Regular Session

Bill Summary

This bill requires the Board of Public Utilities (BPU) to adopt standards providing that, in operating areas that have been affected by a major catastrophic event, every electric distribution line of an electric public utility installed after the effective date of the bill, or installed, reinstalled, or repaired in response to damage resulting from a major catastrophic event, is to be located underground, wherever feasible, as determined by the BPU. In adopting the standards, and in the issuance of orders pursuant to the adoption of the standards, the BPU is to consider applicable industry codes, national electric industry practices, sound engineering judgment, and the ability of an electric public utility to obtain necessary municipal consent, easements, environmental permits, and rights of way. A "major catastrophic event" is defined to mean a natural occurrence arising from conditions beyond the control of the electric public utility, including but not limited to, a thunderstorm, tornado, hurricane, flood, heat wave, snowstorm, ice storm, or earthquake which results in: 1) a sustained interruption of electric, water, or gas utility service to at least 10 percent of the customers in an operating area or 10 percent of the customers of a municipality or county located in an operating area; or 2) the declaration of a state of emergency or disaster by the State or by the federal government.

AI Summary

This bill requires the Board of Public Utilities (BPU) to adopt standards that mandate electric distribution lines in areas affected by major catastrophic events, such as severe storms or natural disasters, to be located underground wherever feasible. The bill defines a "major catastrophic event" as a natural occurrence like a hurricane or earthquake that results in a sustained interruption of utility service to at least 10% of customers in an operating area or the declaration of a state of emergency. The BPU must consider federal regulations, industry codes, and practical factors like obtaining necessary permits and rights-of-way when adopting these underground placement standards.

Committee Categories

Business and Industry

Sponsors (1)

Last Action

Introduced in the Senate, Referred to Senate Economic Growth Committee (on 02/13/2020)