Bill
Bill > A3429
NJ A3429
NJ A3429Directs BPU to conduct study to determine whether deployment of microgrids and generators will reduce length of power outages.
summary
Introduced
02/25/2020
02/25/2020
In Committee
02/25/2020
02/25/2020
Crossed Over
Passed
Dead
01/11/2022
01/11/2022
Introduced Session
2020-2021 Regular Session
Bill Summary
This bill directs the Board of Public Utilities (BPU) to study, prepare, and submit, within six months of the enactment of the bill, to the Governor and to the Legislature a written report that is to contain findings and recommendations concerning whether the utilization of microgrids and the deployment of electric generators will assist in reducing the length of long-term power outages in this State. The BPU's report is to also provide recommendations for improvements to the resilience and reliability of the State's electric distribution system. In conducting the study, the BPU is to: 1) compare the general performance of this State's electric distribution system as compared to that of other states; 2) assess the impact of the utilization of microgrids and the deployment of electric generators on long-term power outages in other states; 3) consult with relevant persons and public and private entities in this State and other states that have utilized microgrids during power outages; 4) consult with relevant electric public utilities in this State and other states that have deployed electric generators to communities during power outages; 5) and consider the cost to ratepayers, municipalities, electric public utilities, and the State associated with the implementation of the findings and recommendations submitted pursuant to this bill. The bill defines "microgrid" as a group of interconnected loads and distributed energy resources within clearly defined electrical boundaries that acts as a single controllable entity with respect to the electric grid, which can connect and disconnect from the electric grid to enable it to operate both connected to, or independent of, the electric grid.
AI Summary
This bill directs the Board of Public Utilities (BPU) to study and submit a report on whether the use of microgrids and deployment of electric generators can help reduce the length of long-term power outages in New Jersey. The BPU is required to compare New Jersey's electric distribution system performance to other states, assess the impact of microgrids and generators on long-term outages in other states, consult with relevant entities, and consider the costs associated with implementing the study's findings and recommendations. The bill defines a "microgrid" as a group of interconnected loads and distributed energy resources that can operate connected to or independent of the electric grid.
Committee Categories
Transportation and Infrastructure
Sponsors (1)
Last Action
Introduced, Referred to Assembly Telecommunications and Utilities Committee (on 02/25/2020)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| BillText | https://www.njleg.state.nj.us/2020/Bills/A3500/3429_I1.HTM |
| Bill | https://www.njleg.state.nj.us/2020/Bills/A3500/3429_I1.PDF |
Loading...