Bill

Bill > HR177


HI HR177

HI HR177
Requesting The Public Utilities Commission To Explore, Through Its Docket Process, The Feasibility Of Relocating Above-ground Electric Transmission Lines And Distribution Lines Underground In High-risk Areas On The Island Of Maui.


summary

Introduced
03/11/2022
In Committee
03/14/2022
Crossed Over
Passed
Dead
05/05/2022

Introduced Session

2022 Regular Session

Bill Summary

RESOLUTION requesting The public utilities commission to explore, through its docket process, the feasibility of relocating above-ground electric transmission lines and distribution lines underground in high-risk areas on the island of Maui. .

AI Summary

This Resolution requests the Public Utilities Commission (PUC), a government agency that oversees utility services, to investigate the practicality of moving overhead electric power lines, which include both large transmission lines and smaller distribution lines, to be buried underground in areas on Maui that are at high risk from natural disasters. These high-risk areas are defined as places prone to strong winds, wildfires, or other severe weather events that have happened in the past, and which could lead to road closures, potentially blocking access to essential facilities like hospitals. The PUC is specifically asked to examine the costs associated with this underground relocation, the current risks to overhead lines from foreseeable natural events and projected sea level rise, and the dangers posed by damage to overhead lines, such as starting wildfires or causing road closures. The PUC must then report its findings, including any feasible relocation plans and timelines, to the State Legislature by a specific date before the 2023 legislative session begins.

Committee Categories

Agriculture and Natural Resources

Sponsors (2)

Last Action

The committee(s) on EEP recommend(s) that the measure be deferred. (on 03/24/2022)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...