Bill
Bill > A4596
NJ A4596
NJ A4596Requires electric public utilities to submit to BPU and implement integrated distribution plans.
summary
Introduced
09/22/2022
09/22/2022
In Committee
09/22/2022
09/22/2022
Crossed Over
Passed
Dead
01/08/2024
01/08/2024
Introduced Session
2022-2023 Regular Session
Bill Summary
This bill would require electric public utilities to submit integrated distribution plans to the Board of Public Utilities (BPU). As defined by the bill, "integrated distribution plan" means a plan developed by an electric public utility to assess the necessary physical and operational changes to the transmission and distribution system in its service area to enable safe, reliable, and affordable service that satisfies customers' changing expectations and facilitates the use of distributed electric power sources. The bill would first require the BPU to develop criteria for the integrated distribution plans no later than six months after the bill's enactment. The bill would establish certain minimum requirements for the criteria, as enumerated in paragraph (1) of subsection a. of section 1 of the bill. The bill would then require, one year after the BPU develops criteria for integrated distribution plans, all electric public utilities in the State to submit to the BPU an integrated distribution plan that conforms to the criteria. Finally, the bill would require each electric public utility to implement its integrated distribution plan, once it is approved by the BPU.
AI Summary
This bill would require electric public utilities in New Jersey to submit integrated distribution plans to the Board of Public Utilities (BPU). An integrated distribution plan is a plan developed by the utility to assess and make necessary physical and operational changes to the transmission and distribution system to enable safe, reliable, and affordable service that meets customers' changing expectations and facilitates the use of distributed electric power sources. The BPU would first be required to develop criteria for the integrated distribution plans within six months of the bill's enactment, and then the utilities would have one year to submit their plans to the BPU for approval. Once approved, the utilities would be required to implement their integrated distribution plans.
Committee Categories
Agriculture and Natural Resources
Sponsors (1)
Last Action
Introduced, Referred to Assembly Environment and Solid Waste Committee (on 09/22/2022)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.njleg.state.nj.us/bill-search/2022/A4596 |
| BillText | https://pub.njleg.gov/Bills/2022/A5000/4596_I1.HTM |
| Bill | https://pub.njleg.gov/Bills/2022/A5000/4596_I1.PDF |
Loading...