summary
Introduced
01/08/2024
01/08/2024
In Committee
04/01/2024
04/01/2024
Crossed Over
02/27/2024
02/27/2024
Passed
06/15/2024
06/15/2024
Dead
Signed/Enacted/Adopted
06/21/2024
06/21/2024
Introduced Session
Fifty-sixth Legislature - Second Regular Session (2024)
Bill Summary
An Act amending section 40-360.03, Arizona Revised Statutes; relating to public utilities.
AI Summary
This bill amends Section 40-360.03 of the Arizona Revised Statutes, which relates to public utilities. The key provisions are:
1) Utilities planning to construct a plant or transmission line in Arizona must first file an application for a certificate of environmental compatibility with the Arizona Corporation Commission.
2) The bill adds a new subsection B that allows utilities to replace conductors or wires on an existing transmission line, or replace existing transmission line structures, without seeking a new certificate of environmental compatibility or holding a hearing, as long as the replacement complies with the terms and conditions of the applicable existing certificate.
Committee Categories
Agriculture and Natural Resources
Sponsors (1)
Last Action
Chapter 248 (on 06/21/2024)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Loading...