Bill
Bill > S478
NJ S478
NJ S478Requires electric distribution lines to be located underground in areas affected by severe weather or natural disasters.
summary
Introduced
01/09/2024
01/09/2024
In Committee
01/09/2024
01/09/2024
Crossed Over
Passed
Dead
01/12/2026
01/12/2026
Introduced Session
2024-2025 Regular Session
Bill Summary
This bill requires the Board of Public Utilities (BPU) to adopt standards providing that, in operating areas that have been affected by a major catastrophic event, every electric distribution line of an electric public utility installed after the effective date of the bill, or installed, reinstalled, or repaired in response to damage resulting from a major catastrophic event, is to be located underground, wherever feasible, as determined by the BPU. In adopting the standards, and in the issuance of orders pursuant to the adoption of the standards, the BPU is to consider applicable industry codes, national electric industry practices, sound engineering judgment, and the ability of an electric public utility to obtain necessary municipal consent, easements, environmental permits, and rights of way. A "major catastrophic event" is defined to mean a natural occurrence arising from conditions beyond the control of the electric public utility, including but not limited to, a thunderstorm, tornado, hurricane, flood, heat wave, snowstorm, ice storm, or earthquake which results in: 1) a sustained interruption of electric, water, or gas utility service to at least 10 percent of the customers in an operating area or 10 percent of the customers of a municipality or county located in an operating area; or 2) the declaration of a state of emergency or disaster by the State or by the federal government.
AI Summary
This bill requires the Board of Public Utilities (BPU) to adopt standards that mandate electric distribution lines of electric public utilities to be located underground, wherever feasible, in areas affected by major catastrophic events, such as severe storms, hurricanes, or earthquakes. The standards will apply to any new electric distribution lines installed after the bill's effective date, as well as lines that are reinstalled or repaired in response to damage from a major catastrophic event. In adopting the standards, the BPU must consider federal regulations, industry codes, national practices, engineering judgment, and the utility's ability to obtain necessary approvals and permissions.
Committee Categories
Business and Industry
Sponsors (1)
Last Action
Introduced in the Senate, Referred to Senate Economic Growth Committee (on 01/09/2024)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.njleg.state.nj.us/bill-search/2024/S478 |
| BillText | https://pub.njleg.gov/Bills/2024/S0500/478_I1.HTM |
Loading...