Bill

Bill > HB4792


IL HB4792

IL HB4792
CLOSED-LOOP WELL SETBACKS


summary

Introduced
02/05/2024
In Committee
04/05/2024
Crossed Over
Passed
Dead
01/08/2025

Introduced Session

103rd General Assembly

Bill Summary

Amends the Illinois Water Well Construction Code. Provides that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. Specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells.

AI Summary

This bill amends the Illinois Water Well Construction Code to provide that the minimum lateral setback distance between a closed-loop well and a storm sewer, sanitary sewer, combined sewer, or any other potential source of contamination is 5 feet. It also specifies that setbacks from footing drains and pits, crawl spaces, and basements do not apply to closed-loop wells. This change aims to establish specific setback requirements for closed-loop wells, which are a type of geothermal heating and cooling system that circulates a fluid through a closed underground loop to transfer heat.

Committee Categories

Agriculture and Natural Resources

Sponsors (2)

Last Action

Session Sine Die (on 01/07/2025)

Bill Topics

Environment
  • ‐ Drinking Water Safety

bill text


bill summary

Loading...

bill summary

Loading...
Loading...