Bill

Bill > SB234


VA SB234

VA SB234
Parking Lot Solar Development Program; established, report.


summary

Introduced
01/09/2024
In Committee
02/15/2024
Crossed Over
02/09/2024
Passed
Dead
02/22/2025

Introduced Session

Potential new amendment
2025 Regular Session

Bill Summary

Parking Lot Solar Development Pilot Grant Program; report. Establishes the Parking Lot Solar Development Pilot Grant Program for the purpose of encouraging development of distributed parking lot solar projects up to one megawatt in size in Chesterfield County and Richmond City through grants. The bill directs the Department of Energy, in consultation with the Department of Environmental Quality, to administer such program, to establish and publish guidelines and criteria for solar projects funded through such program, and to report annually to the General Assembly regarding the administration of the program for the preceding fiscal year.

AI Summary

This bill establishes the Parking Lot Solar Development Pilot Grant Program in Chesterfield County and Richmond City, designed to encourage solar energy development by providing grants for solar installations on parking lot canopies. The program defines specific terms like "solar project" (a photovoltaic installation over a parking lot), "low-income community" (areas with high poverty rates or lower median incomes), and "energy community" (regions with significant employment or revenue from fossil fuel industries). The Department of Energy, in consultation with the Department of Environmental Quality, will administer the program, with a focus on prioritizing solar projects near high electric demand areas, locations that reduce transmission line needs, potential electric vehicle charging sites, and areas in low-income or energy transition communities. The program requires solar project developers to hire local residents and includes provisions for annual reporting to the General Assembly, detailing metrics such as the number of projects installed, acres preserved, solar capacity constructed, jobs created, and overall economic impact. Grants will be funded through appropriated funds, gifts, donations, and other received funds, with a maximum project size of one megawatt.

Committee Categories

Budget and Finance, Business and Industry

Sponsors (2)

Last Action

Left in Appropriations (on 11/18/2024)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...