Bill

Bill > HB1529


TX HB1529

TX HB1529
Relating to production fees imposed by the Southwestern Travis County Groundwater Conservation District; authorizing an increase in the rate of the fee.


summary

Introduced
12/05/2024
In Committee
03/12/2025
Crossed Over
Passed
Dead
06/02/2025

Introduced Session

89th Legislature Regular Session

Bill Summary

AN ACT relating to production fees imposed by the Southwestern Travis County Groundwater Conservation District; authorizing an increase in the rate of the fee.

AI Summary

This bill amends the existing law governing the Southwestern Travis County Groundwater Conservation District by increasing the maximum production fee rate that can be charged for water withdrawal from wells. Currently, the district can impose a production fee of up to 20 cents per thousand gallons of water withdrawn from a well. The bill raises this maximum rate to 50 cents per thousand gallons, effectively allowing the district to triple its potential fee collection. The production fee would apply to wells that are not exempt from permitting under a separate section of the law, and the fee is based on the actual amount of water withdrawn. The bill is set to take effect on September 1, 2025, giving water users and the district advance notice of the potential fee increase. This change could provide the groundwater conservation district with additional revenue to support its water management and conservation efforts.

Committee Categories

Agriculture and Natural Resources

Sponsors (1)

Last Action

Referred to Natural Resources (on 03/12/2025)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...