Bill

Bill > A00232


NY A00232

Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external automatic cutoff switch.


summary

Introduced
01/08/2025
In Committee
01/08/2025
Crossed Over
Passed
Dead

Introduced Session

2025-2026 General Assembly

Bill Summary

AN ACT to amend the executive law, in relation to requiring standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch

AI Summary

This bill requires that new residential electric vehicle (EV) charging stations be constructed with an external automatic cutoff switch, which is a hand-operated switch capable of immediately cutting off all power to the vehicle without requiring a key or unlocking mechanism. The legislation mandates that this cutoff switch must be physically located outside of the house or garage, ensuring quick and easy access in case of emergency. The requirements will apply not only to new construction of EV charging stations but also to the sale or transfer of residences that already have permanently installed charging stations. By adding this provision to the executive law, the bill aims to enhance safety by providing a simple and direct method to interrupt electrical power to an EV charging station, potentially helping to prevent electrical fires or other hazardous situations that might occur during charging.

Committee Categories

Government Affairs

Sponsors (1)

Last Action

referred to governmental operations (on 01/08/2025)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...