Bill
Bill > A00232
NY A00232
Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external automatic cutoff switch.
summary
Introduced
01/08/2025
01/08/2025
In Committee
01/08/2025
01/08/2025
Crossed Over
Passed
Dead
Introduced Session
2025-2026 General Assembly
Bill Summary
AN ACT to amend the executive law, in relation to requiring standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch
AI Summary
This bill requires that new residential electric vehicle (EV) charging stations be constructed with an external automatic cutoff switch, which is a hand-operated switch capable of immediately cutting off all power to the vehicle without requiring a key or unlocking mechanism. The legislation mandates that this cutoff switch must be physically located outside of the house or garage, ensuring quick and easy access in case of emergency. The requirements will apply not only to new construction of EV charging stations but also to the sale or transfer of residences that already have permanently installed charging stations. By adding this provision to the executive law, the bill aims to enhance safety by providing a simple and direct method to interrupt electrical power to an EV charging station, potentially helping to prevent electrical fires or other hazardous situations that might occur during charging.
Committee Categories
Government Affairs
Sponsors (1)
Last Action
referred to governmental operations (on 01/08/2025)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Document Type | Source Location |
---|---|
State Bill Page | https://www.nysenate.gov/legislation/bills/2025/A232 |
BillText | https://assembly.state.ny.us/leg/?default_fld=&bn=A00232&term=2025&Summary=Y&Actions=Y&Text=Y&Committee%26nbspVotes=Y&Floor%26nbspVotes=Y#A00232 |
Loading...