Bill

Bill > A01661


NY A01661

NY A01661
Requires the MTA to submit an annual report on all minor and major contract cost overruns; establishes such report shall include a list of all contracts where overruns exceed one million dollars, all contracting firms involved, the winning bid amounts, the actual costs incurred, a description of the project, completion delays, and an analysis of why the contract bid amount was exceeded.


summary

Introduced
01/10/2025
In Committee
01/07/2026
Crossed Over
Passed
Dead

Introduced Session

2025-2026 General Assembly

Bill Summary

AN ACT to amend the public authorities law, in relation to requiring the metropolitan transportation authority to create an annual report on all minor and major contract cost overruns

AI Summary

This bill requires the Metropolitan Transportation Authority (MTA) to create an annual report detailing contract cost overruns, with specific definitions and comprehensive reporting requirements. The bill defines three levels of cost changes: minor (10-25%), median (25-50%), and major (50% or more) relative to the original project cost. The annual report must include a comprehensive list of all contracts with these cost changes, listing the contracting firms, original and actual project costs, project descriptions, any completion delays, and a detailed analysis explaining why the contract bid amount was exceeded. The report must be delivered electronically to the governor, senate president, and assembly speaker by February 15th each year, covering contracts from the preceding calendar year. The first report will be submitted the February following the bill's effective date, with the goal of increasing transparency and accountability in MTA contract management by providing a clear, systematic overview of project cost variations.

Committee Categories

Government Affairs

Sponsors (1)

Last Action

referred to corporations, authorities and commissions (on 01/07/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...