Bill

Bill > S02591


NY S02591

NY S02591
Requires corporations to provide written notice to the municipality in which the canal is located and properties adjacent to such canal prior to commencing work along such canal; requires the corporation to hold a public hearing prior to commencing such work; allows for exceptions in certain situations.


summary

Introduced
01/21/2025
In Committee
01/07/2026
Crossed Over
Passed
Dead

Introduced Session

2025-2026 General Assembly

Bill Summary

AN ACT to amend the canal law, in relation to requiring corporations to provide written notice to the municipality in which the canal is located and properties adjacent to such canal prior to commencing work along such canal

AI Summary

This bill amends the canal law to require corporations performing work along canals to provide written notice to the municipality and adjacent property owners between 90 and 120 days before starting work, including activities like clearing trees and vegetation. The corporation must hold a public hearing 30-45 days before the work begins, with proper community notification through methods like local news and newspapers, detailing the time, place, and scope of the proposed work. If the work does not start within the initially noticed timeframe, the corporation can issue a 30-day extension notice. In emergency situations, such as potential canal dam failures, flooding risks, or removal of "danger trees" (trees that pose an imminent threat of falling and causing damage), the corporation is exempt from these notification and public hearing requirements. The bill aims to increase transparency and community involvement in canal-related work by ensuring local residents are informed and have an opportunity to provide input before significant projects commence.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

REFERRED TO TRANSPORTATION (on 01/07/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...