Bill

Bill > A5221


NJ A5221

NJ A5221
Requires DCA to review and amend State Uniform Construction Code concerning parking structures to address increased weight of electric vehicles.


summary

Introduced
01/27/2025
In Committee
01/27/2025
Crossed Over
Passed
Dead

Introduced Session

2024-2025 Regular Session

Bill Summary

This bill requires the Commissioner of the Department of Community Affairs (commissioner) to review and amend the State Uniform Construction Code (UCC) to address the increased weight imposed upon those structures due to electric vehicle occupancy. The commissioner is to review and amend the UCC to address both new and existing parking structures. The bill provides that, for new parking structures, the commissioner is to study, develop, and implement UCC requirements, which are to include, but not be limited to: (1) requirements for the increased weight of electric vehicles; (2) new installation codes for electric vehicle chargers; (3) distributing electric vehicle parking spaces for the reduction of load intensity; (4) an analysis of common parking structure construction types to determine whether the parking structure could withstand an increased load; and (5) establishing a minimum of 10 percent electric vehicle parking spaces in new parking structures. The bill further provides that, for existing parking structures, the commissioner is to study, develop, and implement UCC requirements, which are to include, but not be limited to: (1) a review of existing parking structure load requirements; (2) a process for monitoring, measuring, and documenting parking structure performance with increased electric vehicle occupancy; (3) publishing detailed example analysis and strengthening projects as models for assessment and upgrade; and (4) requirements for the owners of parking structures, which the department deems unsound or structurally deficient due to increased electric vehicle occupancy, to develop a remediation plan, including a timeline for coming into compliance within 90 days of the notice of deficiency, or the department is to be empowered to close the parking structure until the owner brings the parking structure into compliance. The bill provides that the commissioner is to, in accordance with the "Administrative Procedure Act," P.L.1968, c.410 (C.52:14B-1 et seq.), adopt rules and regulations as necessary to implement the provisions of the bill. The bill is to take effect on the first day of the third month next following the date of enactment, except that the commissioner is permitted to take anticipatory action necessary to effectuate the provisions of the bill.

AI Summary

This bill requires the Commissioner of the Department of Community Affairs (DCA) to review and update the State Uniform Construction Code (UCC) to address the increased weight of electric vehicles in parking structures. For new parking structures, the bill mandates code requirements including specific standards for electric vehicle weight, charger installation, strategic distribution of electric vehicle parking spaces, an analysis of parking structure construction types, and a requirement that at least 10% of parking spaces be designated for electric vehicles. For existing parking structures, the bill calls for a comprehensive review of load requirements, development of performance monitoring processes, publication of assessment and upgrade models, and a requirement that owners of structurally deficient parking structures create a remediation plan within 90 days or risk having their structure closed. The commissioner is directed to adopt necessary rules and regulations through the Administrative Procedure Act, with the bill taking effect three months after enactment, while allowing the commissioner to take preparatory actions in advance.

Committee Categories

Government Affairs

Sponsors (2)

Last Action

Introduced, Referred to Assembly State and Local Government Committee (on 01/27/2025)

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Loading...