summary
Introduced
01/27/2025
01/27/2025
In Committee
01/27/2025
01/27/2025
Crossed Over
Passed
Dead
Introduced Session
94th Legislature 2025-2026
Bill Summary
A bill for an act relating to transportation; appropriating money for certain Trunk Highway 74 resurfacing in Winona County.
AI Summary
This bill appropriates $1,200,000 from the state's general fund to the Minnesota Department of Transportation specifically for resurfacing a section of Trunk Highway 74 located between north of Elba and Winona County State-Aid Highway 30 in Winona County. The funding will cover project expenses including design, engineering, right-of-way acquisition, and construction. The commissioner of transportation is given flexibility in the road resurfacing method, with options to use Otta seal, double Otta seal, or double chip seal techniques. The appropriation is designated as a one-time funding allocation and will be available until June 30, 2028, providing a specific timeframe for project completion. This targeted infrastructure investment aims to improve the condition and safety of a specific highway segment in Winona County.
Committee Categories
Transportation and Infrastructure
Sponsors (2)
Last Action
Hearing (15:00:00 2/24/2025 ) (on 02/24/2025)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.revisor.mn.gov/bills/bill.php?b=Senate&f=SF0620&ssn=0&y=2025 |
| BillText | https://www.revisor.mn.gov/bills/text.php?number=SF620&version=0&session=ls94&session_year=2025&session_number=0&format=pdf |
Loading...