CA SB742Electricity: electrical infrastructure: permanently abandoned transmission facilities: emergency response: liaisons.
summary
Introduced
02/21/2025
02/21/2025
In Committee
01/22/2026
01/22/2026
Crossed Over
01/26/2026
01/26/2026
Passed
Dead
Introduced Session
2025-2026 Regular Session
Bill Summary
An act to amend Section 8386 of, to add Section 762.8 to, and to add Chapter 8 (commencing with Section 8395) to Division 4.1 of, the Public Utilities Code, relating to electricity.
AI Summary
This bill requires electrical corporations to remove permanently abandoned transmission facilities by January 1, 2028, and to include a plan for their removal and wildfire mitigation measures in their wildfire mitigation plans, which are submitted to the Office of Energy Infrastructure Safety for review. A "permanently abandoned transmission facility" is defined as a transmission facility that is out of service and for which the owner cannot demonstrate an intent to return it to service within a commission-determined timeframe. Additionally, electrical corporations and local publicly owned electric utilities must establish procedures for coordinating with emergency response agencies and assign liaison representatives to local emergency operations centers to improve emergency response efforts. The bill also clarifies that these requirements do not affect an electrical corporation's right to an easement.
Committee Categories
Budget and Finance, Transportation and Infrastructure
Sponsors (2)
Last Action
In Assembly. Read first time. Held at Desk. (on 01/26/2026)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Loading...