Bill
Bill > A05918
NY A05918
NY A05918Directs empire state development, in conjunction with the office of general services, to create a plan to develop mixed-use commercial and residential property on a certain portion of the Harriman campus; directs such plan to be completed and made available for public comment no later than 180 days after the effective date; directs empire state development, in conjunction with the office of general services, to create a master plan for the redesign of the Harriman campus; directs that such plan
summary
Introduced
02/24/2025
02/24/2025
In Committee
02/24/2025
02/24/2025
Crossed Over
Passed
Dead
Introduced Session
2025-2026 General Assembly
Bill Summary
AN ACT directing the empire state development corporation, in conjunction with the office of general services, to create plans for the development of mixed-use commercial and residential property on a certain portion of the Harriman campus, and for redesign of the Harriman campus
AI Summary
This bill directs Empire State Development (ESD) and the Office of General Services (OGS) to develop two interconnected plans for the Harriman state office building campus in Albany, New York. First, the bill requires ESD and OGS to conduct a development study to repurpose at least 7 acres of the Wadsworth Project site (a 27-acre life sciences public health laboratory site) for mixed-use commercial and residential property. This development study must be completed within 180 days of the bill's effective date and will include a 45-day public comment period. Second, the bill mandates that ESD and OGS create a broader master plan for redesigning the entire Harriman campus, which must be completed within one year of the bill's effective date. The master plan must address several key aspects, including identifying sites for mixed-use development, redesigning the campus ring road, analyzing parking needs, and developing infrastructure. The plan should also prioritize neighborhood integration, workforce and low-to-middle-income housing, and multi-modal transportation infrastructure. Like the development study, the master plan will also undergo a 45-day public comment period before finalization.
Committee Categories
Government Affairs
Sponsors (3)
Last Action
print number 5918a (on 05/16/2025)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Loading...