Bill

Bill > HB1546


MO HB1546

Creates provisions relating to water exportation outside the state


summary

Introduced
02/27/2025
In Committee
05/15/2025
Crossed Over
Passed
Dead
05/16/2025

Introduced Session

2025 Regular Session

Bill Summary

Creates provisions relating to water exportation outside the state

AI Summary

This bill creates a comprehensive regulatory framework for water exportation outside the state of Missouri, establishing strict requirements and a detailed permitting process managed by the Missouri Department of Natural Resources. The bill requires any person seeking to export water outside the state to obtain a water exportation permit, with an exemption for public water systems withdrawing water within the same hydrological unit code and within 30 miles of the state border. The permit application process involves a thorough review by the department director, who must evaluate multiple conditions including water availability, present need, beneficial use, potential interference with existing or proposed in-state water uses, and the feasibility of alleviating water shortages within Missouri. The bill mandates a 180-day review period, includes a public comment phase, and requires review and approval from the clean water commission and Missouri soil and water districts commission. Permits are time-limited to three years and subject to renewal, with provisions for reevaluation under specific conditions such as drought conditions or potential negative impacts on beneficial water use. The bill also includes enforcement mechanisms, allowing the attorney general to bring injunctive actions for violations, and requires notification to county commissions where water exportation is proposed. Importantly, the bill prioritizes Missouri's water resources by ensuring that in-state water needs are protected before allowing exportation.

Sponsors (1)

Last Action

Referred: Emerging Issues(H) (on 05/15/2025)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...