Bill

Bill > S06018


NY S06018

NY S06018
Authorizes and directs the New York state power authority to rename the Robert Moses Niagara Power Plant located in the town of Lewiston, county of Niagara, to the Shirley J. Hamilton Niagara Power Plant.


summary

Introduced
03/04/2025
In Committee
01/07/2026
Crossed Over
05/19/2025
Passed
Dead

Introduced Session

2025-2026 General Assembly

Bill Summary

AN ACT in relation to authorizing and directing the New York state power authority to rename the Robert Moses Niagara Power Plant to the Shirley J. Hamilton Niagara Power Plant

AI Summary

This bill authorizes and directs the New York State Power Authority (NYSPA) to rename the Robert Moses Niagara Power Plant, which is located in the town of Lewiston in Niagara County, to the Shirley J. Hamilton Niagara Power Plant. The legislation specifically overrides any existing laws, rules, or regulations that might otherwise prevent such a renaming. By mandating this change, the bill appears to be honoring Shirley J. Hamilton, though the specific reasons for the namesake change are not detailed in the text. The bill includes a standard provision stating that it will take effect immediately upon enactment, which means the power plant could be renamed as soon as the bill becomes law.

Committee Categories

Government Affairs

Sponsors (1)

Last Action

REFERRED TO CORPORATIONS, AUTHORITIES AND COMMISSIONS (on 01/07/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...