Bill

Bill > H3666


MA H3666

MA H3666
Relative to increased transportation options for Arlington and Lexington


summary

Introduced
02/27/2025
In Committee
01/12/2026
Crossed Over
Passed
Dead

Introduced Session

194th General Court

Bill Summary

Relative to the financial feasibility and capability of providing rapid transit to the towns of Arlington and Lexington. Transportation.

AI Summary

This bill establishes a 10-member commission to study the financial feasibility and capability of providing enhanced transportation options for Arlington and Lexington, specifically by evaluating two potential rapid transit solutions: extending the MBTA (Massachusetts Bay Transportation Authority) red line to include stops in these towns, or creating a Bus Rapid Transit (BRT) line along Route 2 from Alewife to the I-95 interchange with stops in Arlington and Lexington. The commission will be composed of 3 representatives from the House of Representatives (including 1 appointed by the minority leader), 3 senators (including 1 appointed by the minority leader), the secretary of transportation or their designee, the MBTA chairman or their designee, and 2 members appointed by the governor. The commission is required to complete a comprehensive evaluation of both transit options and produce a final recommendation, with the mandate to file their findings and recommendations with the joint committee on transportation within twelve months of the bill's passage.

Committee Categories

Budget and Finance, Transportation and Infrastructure

Sponsors (2)

Last Action

Committee recommended ought to pass and referred to the committee on House Ways and Means (on 01/12/2026)

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Document Type Source Location
State Bill Page https://malegislature.gov/Bills/194/H3666
BillText https://malegislature.gov/Bills/194/H3666.pdf
Loading...