Bill
Bill > SJR3
DE SJR3
DE SJR3Directing All Electric Public Utilities In Delaware To Participate In A Study To Be Undertaken By The Delaware Sustainable Energy Utility To Assess And Analyze The Costs And Benefits Of The Adoption Of Energy Storage Systems In Delaware, And Directing The Delaware Sustainable Energy Utility To Conduct A Pilot Program With The Participation And Cooperation Of Certain Electric Utilities To Develop And Deploy Pilot Projects Involving Battery Storage Systems In Delaware.
summary
Introduced
03/21/2025
03/21/2025
In Committee
04/03/2025
04/03/2025
Crossed Over
03/27/2025
03/27/2025
Passed
07/16/2025
07/16/2025
Dead
Signed/Enacted/Adopted
07/16/2025
07/16/2025
Introduced Session
153rd General Assembly
Bill Summary
Directing All Electric Public Utilities In Delaware To Participate In A Study To Be Undertaken By The Delaware Sustainable Energy Utility To Assess And Analyze The Costs And Benefits Of The Adoption Of Energy Storage Systems In Delaware, And Directing The Delaware Sustainable Energy Utility To Conduct A Pilot Program With The Participation And Cooperation Of Certain Electric Utilities To Develop And Deploy Pilot Projects Involving Battery Storage Systems In Delaware.
AI Summary
This resolution directs the Delaware Sustainable Energy Utility (DESEU) to conduct a comprehensive study and pilot program on energy storage systems (ESS) in Delaware, which are technologies that store electricity for later use, such as batteries or compressed air systems. The resolution requires all electric public utilities in Delaware to participate in a detailed assessment of the costs and benefits of ESS, both for grid-connected (in front of the meter) and on-site (behind the meter) applications. The study will explore various aspects including regulatory issues, potential demand reduction, infrastructure investment deferral, renewable energy integration, grid service values, community impacts, and market-based incentives. Additionally, the DESEU is mandated to work with Delmarva Power & Light Company, the Delaware Municipal Electric Corporation, the Delaware Electric Cooperative, and an independent power producer to develop and deploy at least one battery storage pilot project, with the DESEU providing guidance and funding. The resolution requires a preliminary status report by December 31, 2025, and a comprehensive final report by June 1, 2026, detailing the study's findings and potential future energy storage deployment in Delaware, with the ultimate goals of enhancing grid reliability, reducing electricity costs, and promoting economic development through innovative energy technologies.
Committee Categories
Agriculture and Natural Resources, Transportation and Infrastructure
Sponsors (15)
Stephanie Hansen (D)*,
Frank Burns (D),
Kyra Hoffner (D),
Russ Huxtable (D),
Larry Lambert (D),
Tizzy Lockman (D),
Eric Morrison (D),
DeShanna Neal (D),
Brian Pettyjohn (R),
Bryant Richardson (R),
Raymond Seigfried (D),
Rebecca Snyder-Hall (D),
Dave Sokola (D),
Jack Walsh (D),
Dave Wilson (R),
Last Action
Signed by Governor (on 07/16/2025)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Loading...