NY S08114Provides that in the siting of new electric transmission facilities, including high-voltage transmission lines, the following corridors shall be utilized in the following order of priority in accordance with feasibility of economic and engineering considerations, reliability of the electric system and the protection of the environment: existing utility corridors; highway (interstate, freeway and state trunk) and railroad corridors; recreational trails, to the extent that the facilities may be co
summary
Introduced
05/15/2025
05/15/2025
In Committee
01/07/2026
01/07/2026
Crossed Over
Passed
Dead
Introduced Session
2025-2026 General Assembly
Bill Summary
AN ACT to amend the public service law and the highway law, in relation to the siting of new electric transmission facilities
AI Summary
This bill establishes a prioritized approach for siting new electric transmission facilities, including high-voltage transmission lines, by creating a systematic order of corridor usage based on feasibility, economic and engineering considerations, electric system reliability, and environmental protection. The priority order for transmission line corridors is: (1) existing utility corridors, (2) highway and railroad corridors, (3) recreational trails (with specific underground and environmental restrictions), and (4) new corridors. The bill also grants utilities more flexibility to construct high-voltage transmission lines along public rights-of-way and highways, subject to transportation department approval. Additionally, the legislation requires the transportation department to coordinate with utilities by assigning a project coordinator within 30 days of a written request, sharing future project plans, and developing a "constructability report" that outlines terms for co-location projects. Notably, if the transportation department requires a transmission line to be relocated sooner than agreed or with less than ten years' notice, the department will be responsible for 75% of the relocation costs. The bill aims to streamline the process of developing electric transmission infrastructure while balancing safety, environmental, and economic considerations.
Committee Categories
Transportation and Infrastructure
Sponsors (1)
Last Action
REFERRED TO ENERGY AND TELECOMMUNICATIONS (on 01/07/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.nysenate.gov/legislation/bills/2025/S8114 |
| BillText | https://assembly.state.ny.us/leg/?default_fld=&bn=S08114&term=2025&Summary=Y&Actions=Y&Text=Y&Committee%26nbspVotes=Y&Floor%26nbspVotes=Y#S08114 |
Loading...