Bill

Bill > S08031


NY S08031

NY S08031
Authorizes and directs the public service commission and the energy research and development authority to conduct a study to determine the possibility of closing peaker plants throughout the state.


summary

Introduced
05/15/2025
In Committee
01/07/2026
Crossed Over
Passed
Dead

Introduced Session

2025-2026 General Assembly

Bill Summary

AN ACT in relation to authorizing and directing the public service commission and the New York state energy research and development authority to conduct a study to determine the possibility of closing peaker plant electric generating facilities; and providing for the repeal of such provisions upon expiration thereof

AI Summary

This bill authorizes and directs the New York Public Service Commission (PSC) and the New York State Energy Research and Development Authority (NYSERDA) to conduct a comprehensive study on the potential closure of peaker plants across the state. Peaker plants are power generation facilities that only operate during periods of high energy demand, typically burning fossil fuels like oil, diesel, or natural gas. The study must examine multiple aspects, including the impact on electricity prices, grid reliability, potential replacement with renewable energy systems or battery storage, effects on disadvantaged communities, and workforce implications. Specifically, the study will analyze changes in wholesale electricity prices, identify alternative energy sources, explore how renewable energy can maintain grid stability, develop strategies for plant replacement, assess potential job displacements, and examine means of retraining workers for renewable energy roles. The PSC and NYSERDA are required to issue a final report within one year to state leadership and post it publicly, with the entire act set to expire two years after its effective date. The bill acknowledges that many existing peaker plants are inefficient, located in environmental justice communities, and contribute significantly to greenhouse gas and pollutant emissions.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

REFERRED TO ENERGY AND TELECOMMUNICATIONS (on 01/07/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...