Bill

Bill > SB443


NH SB443

NH SB443
Relative to wastewater engineering.


summary

Introduced
11/21/2025
In Committee
03/04/2026
Crossed Over
Passed
Dead

Introduced Session

2026 Regular Session

Bill Summary

This bill adds rulemaking authority for certain requirements for review and approval of wastewater infrastructure plans and specifications including the sewer connection permit program. This bill is a request of the department of environmental services.

AI Summary

This bill modifies the state's wastewater engineering regulations by expanding the Department of Environmental Services' authority and rulemaking capabilities related to wastewater infrastructure. Specifically, the bill removes the requirement for filing wastewater system plans 30 days before construction and grants the department broader powers to review, approve, or deny engineering documents associated with pollution control projects. The bill establishes new provisions for the department to review industrial discharge permits and create a sewer connection permit program, including the ability to set standards and guidelines for innovative waste treatment systems. The legislation also adds rulemaking authority for industrial discharge permits, sewer connection permits, and pretreatment standards. By providing more comprehensive oversight, the bill aims to ensure proper design, construction, and operation of wastewater facilities while maximizing the effectiveness of sewerage and pollution control infrastructure with the most efficient use of federal, state, and local funds. The new regulations will take effect 60 days after the bill's passage.

Committee Categories

Agriculture and Natural Resources

Sponsors (9)

Last Action

Committee Report: Ought to Pass; Vote 5-0; Consent Calendar (on 03/04/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...