Bill
Bill > A6258
NJ A6258
NJ A6258Modifies various provisions of State's renewable energy incentive programs; requires electric public utilities to interconnect certain solar projects.
summary
Introduced
12/11/2025
12/11/2025
In Committee
12/11/2025
12/11/2025
Crossed Over
Passed
Dead
01/12/2026
01/12/2026
Introduced Session
2024-2025 Regular Session
Bill Summary
This bill would modify various provisions of the State's renewable energy incentive programs and require electric public utilities to interconnect certain solar projects. Specifically, the bill would authorize the co-location of solar facilities that are either registered, or seeking registration or participation in, the SREC-II program, including the administratively determined incentive (ADI) portion and the competitive solicitation incentive (CSI) portion, the community solar program, the remote net metering program, or any combination of those programs. As used in the bill, "co-location" means siting two or more SREC-II eligible solar facilities on the same property or on contiguous properties, such that the individual facilities are eligible for a higher incentive value than they would be if they were combined into one single facility. The bill would also provide that there would be no size or power output restriction for solar facilities that are located on landfills, brownfields, contaminated sites, or mining sites for the purposes of eligibility for the community solar program or the remote net metering program. The bill would provide that a project sited on a landfill, brownfield, contaminated site, or mining site that is participating in the community solar program or the remote net metering program would have no less than 33 months from the date of registration in the applicable program to achieve commercial operation. In addition, under the bill, a developer that previously received an approval in the TREC program for any project that has not achieved commercial operation would be required to register the project, within 90 days after the effective date of the bill, in the community solar program, the remote net metering program, or both programs if the facilities are co-located, for registrations that would not decrease the project's approved size. If the registration would decrease the project's approved size, the developer would be authorized, but not required, to register in the community solar program, the remote net metering program, or both. The bill would require electric public utilities to accept, process, and approve interconnection applications, within 90 days of receipt, for community solar or remote net metering facilities on any electric line that is sized 34.5 kilovolts or less, and to allow the facilities to interconnect on the lines within 30 days after the utility receives written notification from the developer that the project is ready for interconnect. The bill would establish a $5,000 per-day penalty for utilities that fail to meet these deadlines. The bill would also provide that any electric line maintained by an electric public utility that is sized at 34.5 kilovolts or less would be considered to be distribution lines, would be subject to Board of Public Utilities (BPU) jurisdiction, and would be eligible for interconnection by any project participating a State-sponsored solar electricity incentive program or battery energy storage program. In addition the bill would provide that renewable energy facilities would be eligible to utilize previously awarded, but not utilized TREC incentives, under certain conditions established by the bill. The bill would amend a section of current law that provides that certain renewable energy facilities are permitted uses in municipal industrial districts, in order to include energy storage facilities within the definition of "renewable energy facility." Similarly, the bill would amend a section of current law that provides that solar facilities sited on landfills and closed resource extraction operations are permitted uses within every municipality. The bill would broaden this section to include battery storage and other renewable energy facilities, and to extend to facilities sited on brownfields, contaminated sites, and mining sites. The bill would create an exemption for the purchase of remote net metering credits, similar renewable energy credits, or renewable energy production credits pursuant to a program administered by the BPU from the public bidding requirements of the "Local Public Contracts Law," P.L.1971, c.198 (C.40A:11-1 et seq.). Finally, the bill would amend the statute establishing the State's remote net metering program, section 6 of P.L.2018, c.17 (C.48:3-87.12), to (1) raise the maximum size of projects allowed in the program from five megawatts to 20 megawatts, and (2) modify the types of properties suitable to host remote net metering solar facilities, which are listed in the statute.
AI Summary
This bill modifies various provisions of New Jersey's renewable energy incentive programs to promote solar and energy storage development. The bill allows for the co-location of solar facilities across multiple renewable energy programs, removes size restrictions for solar projects on landfills, brownfields, contaminated sites, and mining sites, and provides projects on these sites with 33 months to achieve commercial operation. Developers with previously approved but uncommercial Transition Renewable Energy Certificate (TREC) projects can now register these projects in community solar or remote net metering programs. The bill requires electric utilities to process and approve interconnection applications for solar and community solar projects within 90 days, with a $5,000 per day penalty for failing to meet deadlines. Additionally, the legislation expands the definition of renewable energy facilities to include battery storage, broadens zoning permissions for solar and renewable energy projects on specific sites, and creates an exemption from public bidding requirements for certain renewable energy credit purchases. The bill also increases the maximum size of remote net metering projects from 5 to 20 megawatts and expands the types of properties eligible to host these projects. These changes aim to streamline renewable energy development and provide more flexibility for solar and energy storage projects in New Jersey.
Committee Categories
Transportation and Infrastructure
Sponsors (2)
Last Action
Assembly Telecommunications and Utilities Hearing (10:00:00 1/5/2026 Committee Room 13, 4th Floor, State House Annex, Trenton, NJ) (on 01/05/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.njleg.state.nj.us/bill-search/2024/A6258 |
| BillText | https://pub.njleg.gov/Bills/2024/A6500/6258_I1.HTM |
Loading...