summary
Introduced
01/06/2026
01/06/2026
In Committee
01/06/2026
01/06/2026
Crossed Over
Passed
Dead
Introduced Session
2025-2026 Session
Bill Summary
This bill proposes to increase the fees for electric generation facility applications.
AI Summary
This bill proposes to increase the fees associated with applying for and modifying electric generation facilities that require a certificate of public good, a permit granted by the Public Utility Commission (PUC) to ensure projects serve the public interest. Specifically, the fee for initial applications for smaller facilities (50 kW or less), rooftop projects, net metering registrations, certain applications under section 248(n), and smaller energy storage facilities (1 MW or less) located inside existing buildings without ground disturbance or distribution system upgrades will increase from $100 to $200. The fee for modifications to these smaller facilities will also increase from $25 to $200. For larger electric generation and energy storage facilities requiring a certificate of public good that do not qualify for the lower fees, the per kilowatt (kW) fee will rise from $5 to $8, and the modification fee will increase from $100 to $400. This act is set to take effect on July 1, 2026.
Committee Categories
Agriculture and Natural Resources
Sponsors (1)
Last Action
House Committee on Energy and Digital Infrastructure Hearing (00:00:00 1/7/2026 ) (on 01/07/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://legislature.vermont.gov/bill/status/2026/H.561 |
| BillText | https://legislature.vermont.gov/Documents/2026/Docs/BILLS/H-0561/H-0561%20As%20Introduced.pdf |
Loading...