Bill

Bill > S08645


NY S08645

NY S08645
Authorizes ORES to issue siting permits for battery energy storage systems for use by data centers, regardless of the expected storage or transmission capacity of such battery energy storage systems, and whether or not such battery energy storage systems will be co-located with renewable energy systems; requires data centers to submit carbon reduction plans.


summary

Introduced
01/07/2026
In Committee
01/07/2026
Crossed Over
Passed
Dead

Introduced Session

2025-2026 General Assembly

Bill Summary

AN ACT to amend the public service law, in relation to authorizing ORES to issue siting permits for battery energy storage systems for use by data centers, and requiring data centers to submit carbon reduction plans

AI Summary

This bill authorizes the Office of Renewable Energy Siting (ORES) to issue permits for battery energy storage systems specifically for data centers, which are defined as facilities primarily used for storing, processing, or transmitting digital information with a significant electrical load of at least one megawatt. This authorization applies regardless of the battery system's storage or transmission capacity, or whether it's located alongside renewable energy systems. However, ORES will not approve permits for battery systems in data centers that do not include renewable energy systems or other approved zero-carbon emission energy sources in their carbon reduction plans. The bill also mandates that all data centers, both existing and new, must develop and submit carbon reduction plans that align with state climate targets, with specific deadlines for submission based on their operational status. The Public Service Law is amended to include these provisions, and the Department is empowered to create necessary rules and regulations.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

REFERRED TO ENERGY AND TELECOMMUNICATIONS (on 01/07/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...