Electric utilities; electric grid utilization metrics; State Corporation Commission.


summary

Introduced
01/12/2026
In Committee
02/23/2026
Crossed Over
03/02/2026
Passed
04/13/2026
Dead
Signed/Enacted/Adopted
04/13/2026

Introduced Session

2026 Regular Regular Session

Bill Summary

Phase I and Phase II Utilities; electric grid utilization metrics. Requires Dominion Energy and Appalachian Power to petition the State Corporation Commission for approval of grid utilization metrics by October 15, 2026, which petition may be consolidated with the integrated resource plan filing for Dominion Energy in 2026. Under the bill, the petition shall include certain assessments comparing current electric grid system performance with optimal utilization of existing electric grid assets. The bill also requires the Commission to include in an existing annual report its findings on each applicable utility's assessment of relevant grid utilization metrics, which shall include an analysis of the potential for each applicable utility to increase electric grid utilization through the deployment of non-wires alternatives. This bill is identical to SB 621.

AI Summary

This bill requires major electric utilities, specifically Dominion Energy and Appalachian Power (referred to as Phase I and Phase II Utilities), to propose specific measurements, known as "grid utilization metrics," to the State Corporation Commission (SCC) by October 15, 2026, for approval. These metrics will assess how efficiently the utilities are using their existing electric grid infrastructure, comparing current performance to optimal use, and will include specific calculations like load-to-capacity ratios and electricity loss percentages. The SCC will then decide which metrics to approve and how they should be applied and reported, potentially influencing future decisions on utility cost recovery for infrastructure investments. Furthermore, the SCC will include its findings on these metrics and an analysis of how utilities can improve grid utilization, particularly through "non-wires alternatives" (like energy storage, distributed generation, and virtual power plants), in its annual report to the Governor and the General Assembly.

Committee Categories

Business and Industry

Sponsors (2)

Last Action

Acts of Assembly Chapter text (CHAP0611) (on 04/13/2026)

Bill Topics

Energy
  • ‐ Alternative and Renewable Energy
  • ‐ Electricity and Hydroelectricity

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Document Type Source Location Created
State Bill Page https://lis.virginia.gov/bill-details/20261/HB434 01/12/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/CHAP0611 04/21/2026
Fiscal Note/Analysis - Fiscal Impact Statement from State Corporation Commission (HB434) https://lis.blob.core.windows.net/files/1207986.PDF 03/12/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/HB434ER 03/05/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/HB434S1 02/24/2026
Fiscal Note/Analysis - Fiscal Impact Statement from State Corporation Commission (HB434) https://lis.blob.core.windows.net/files/1105423.PDF 02/01/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/HB434H1 01/27/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/HB434HC2 01/22/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/HB434HC1 01/22/2026
BillText https://lis.virginia.gov/bill-details/20261/HB434/text/HB434 01/12/2026
Loading...