Land subdivision and development; mandatory provisions of a subdivision ordinance.


summary

Introduced
01/13/2026
In Committee
01/13/2026
Crossed Over
Passed
Dead

Introduced Session

2026 Regular Regular Session

Bill Summary

Land subdivision and development; mandatory provisions of a subdivision ordinance; periodic partial and final release of certain performance guarantees. Provides that the amount of a certified check, cash escrow, bond, or letter of credit required to be furnished by an owner or developer to a governing body related to certain improvements dedicated for public use within any subdivision shall not exceed the total estimated cost of construction as determined by a duly licensed professional engineer or land surveyor and a reasonable allowance for estimated administrative costs, inflation, and potential damage to existing roads or utilities, which shall not exceed five percent of the estimated construction costs. Current law requires that such amount not exceed the total of the estimated cost of construction based on unit prices for new public or private sector construction in the locality and such reasonable allowance, which shall not exceed 10 percent of the estimated construction costs. The bill also provides that periodic partial releases of certain performance guarantees granted to subdividers or developers may not occur before the completion of at least 15 percent of the public facilities covered by any bond, escrow, letter of credit, or other performance guarantee. Current law provides such partial release may not occur before the completion of at least 30 percent of such public facilities. The bill also requires that a certification of partial or final completion of such public facilities from a duly licensed professional engineer or land surveyor be accepted without requiring further inspection of such public facilities. Current law allows, but does not require, such certifications be accepted without further inspection.

AI Summary

This bill modifies regulations concerning land subdivision and development, specifically focusing on performance guarantees required from developers for public improvements. It reduces the maximum allowable amount for these guarantees, which can be in the form of a certified check, cash escrow, bond, or letter of credit, to the total estimated construction cost plus a smaller allowance (not exceeding five percent) for administrative costs, inflation, and potential damage to existing infrastructure, down from the previous ten percent. Furthermore, the bill lowers the threshold for periodic partial releases of these guarantees, allowing them after at least fifteen percent of the public facilities are completed, compared to the previous thirty percent requirement. Crucially, it mandates that certifications of partial or final completion from a licensed professional engineer or land surveyor must be accepted by governing bodies without requiring further inspection, whereas current law only permits this.

Committee Categories

Government Affairs

Sponsors (1)

Last Action

Left in Committee Counties, Cities and Towns (on 02/18/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...