summary
Introduced
01/22/2026
01/22/2026
In Committee
03/23/2026
03/23/2026
Crossed Over
03/04/2026
03/04/2026
Passed
Dead
06/14/2026
06/14/2026
Introduced Session
Potential new amendment
Fifty-seventh Legislature - Second Regular Session (2026)
Bill Summary
AN ACT amending title 40, chapter 2, article 6.2, arizona revised statutes, by adding section 40-360.14; relating to the power plant and transmission line siting committee.
AI Summary
This bill exempts certain new power plants from the requirement to obtain a certificate of environmental compatibility, which is a permit ensuring environmental suitability for power plant construction. Specifically, a utility, after giving 30 days' notice and holding a public meeting in the affected county, can build a new plant without this certificate if it is located alongside an "extra high load factor customer" (meaning a customer with very high and consistent energy usage, defined by the commission based on energy demand measured in megawatts or megawatt hours) and that customer has already secured necessary zoning approvals. The bill also mandates that the commission, which is the regulatory body overseeing utilities, create rules to define what "colocated with" means in terms of physical distance or the nature of the electrical connection between the plant and the customer, and to define "extra high load factor customer" without unfairly discriminating against different industries or users, as long as their energy demand characteristics are considered.
Committee Categories
Business and Industry, Government Affairs
Sponsors (1)
Last Action
Senate third reading FAILED voting: (15-14-1-0) (on 06/10/2026)
Bill Topics
Energy
- ‐ Electricity and Hydroelectricity
Official Document
bill text