Bill
Bill > HB1538
MS HB1538
MS HB1538MDOT; require to prioritize planning/completion of the U.S. Highway 25 four-lane bypass in Monroe County.
summary
Introduced
01/19/2026
01/19/2026
In Committee
01/19/2026
01/19/2026
Crossed Over
Passed
Dead
02/03/2026
02/03/2026
Introduced Session
2026 Regular Session
Bill Summary
An Act To Direct The Mississippi Department Of Transportation To Prioritize Planning And Completion Of The United States Highway 25 Four-lane Bypass In Monroe County, Mississippi; To Require Reporting On Project Status, Cost Estimates, And Funding Options; And For Related Purposes.
AI Summary
This bill directs the Mississippi Department of Transportation (MDOT) to make the planning and completion of the United States Highway 25 four-lane bypass in Monroe County a top priority, recognizing its importance for safety, moving goods, and boosting the local economy. To achieve this, MDOT must conduct or update all necessary planning and engineering studies, including estimates for costs, land acquisition (right-of-way needs), and how the construction will be done in stages (construction phasing). The bill also requires MDOT to explore all possible state and federal funding options, such as special federal grants for transportation projects, and to create a plan for how to pay for the bypass. Finally, MDOT must provide a written report by December 1, 2026, to the leaders of the House and Senate Transportation Committees, detailing the project's progress, expected completion dates, cost estimates, and suggested funding methods.
Committee Categories
Transportation and Infrastructure
Sponsors (1)
Last Action
Died In Committee (on 02/03/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://billstatus.ls.state.ms.us/2026/pdf/history/HB/HB1538.xml |
| BillText | https://billstatus.ls.state.ms.us/documents/2026/html/HB/1500-1599/HB1538IN.htm |
Loading...