Bill

Bill > HB1491


VA HB1491

VA HB1491
Electric utilities; construction of new overhead transmission lines, siting requirements.


summary

Introduced
01/23/2026
In Committee
02/17/2026
Crossed Over
02/13/2026
Passed
Dead

Introduced Session

2026 Regular Regular Session

Bill Summary

Electric utilities; construction of certain electrical transmission lines; siting requirements. Requires the State Corporation Commission, in order to approve the construction of an electrical transmission line of 138 kilovolts or more, to determine that the corridor or route chosen for the line will avoid or reasonably minimize adverse impact to the greatest extent reasonably practicable on dwelling houses. For overhead transmission lines of 500 kilovolts or more constructed by Dominion Energy Virginia, the bill directs the Commission to prioritize approving corridors or routes for construction for which the center is located further than 150 feet from any dwelling house, public or private school building, day care, or place of worship unless no other practicable alternative exists.

AI Summary

This bill requires the State Corporation Commission (SCC) to consider health, safety, and environmental protection when approving the construction of electrical transmission lines of 138 kilovolts (kV) or more, ensuring that the chosen route minimizes adverse impacts to the greatest extent practicable. Specifically, the SCC must determine that the chosen corridor or route for such lines will avoid negative effects on people's health and safety and provide the highest possible level of environmental protection. The bill prohibits the SCC from approving the construction of these lines if any part of the line would be within 500 feet of a school, residential property, daycare, park, playground, recreational area, or place of worship, unless there's no other feasible alternative. Additionally, approval is denied if the line's construction would significantly conflict with local plans for open space, environmental protection, or residential land use. For new overhead transmission lines of 500 kV or more built by a "Phase II Utility" (a term defined in the bill related to energy generation and transmission), the SCC will prioritize routes where the center of the corridor is further than 150 feet from dwelling houses, schools, daycares, or places of worship, unless no practical alternative exists.

Committee Categories

Business and Industry

Sponsors (9)

Last Action

Referred to Committee on Commerce and Labor (on 02/17/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...