Bill
Bill > SB00242
CT SB00242
CT SB00242An Act Requiring A Study Of The Feasibility Of Reducing The Time To Switch Electric Suppliers.
summary
Introduced
02/19/2026
02/19/2026
In Committee
02/19/2026
02/19/2026
Crossed Over
Passed
Dead
Introduced Session
2026 General Assembly
Bill Summary
To require the Consumer Counsel to conduct a study of the feasibility of reducing the time it takes a consumer to switch electric suppliers.
AI Summary
This bill mandates that the Consumer Counsel, a state official responsible for representing consumer interests, undertake a study to determine if it's practical to shorten the timeframe for consumers to switch their electric suppliers. Specifically, the study will investigate the feasibility of requiring that once a consumer informs their electric distribution company, which is the company that delivers electricity to their home or business, of their decision to change providers, the switch should be completed within three business days and appear on their next bill. To inform this study, the Consumer Counsel must seek written feedback from each electric distribution company. The findings of this study, along with the Consumer Counsel's conclusions, are to be presented in a report to the relevant legislative committee on energy by January 15, 2027. This provision is set to become effective on October 1, 2026.
Committee Categories
Transportation and Infrastructure
Sponsors (1)
Other Sponsors (1)
Energy and Technology Committee (Joint)
Last Action
Energy and Technology Public Hearing (00:00:00 2/24/2026 ) (on 02/24/2026)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.cga.ct.gov/asp/cgabillstatus/cgabillstatus.asp?selBillType=Bill&bill_num=SB00242&which_year=2026 |
| BillText | https://www.cga.ct.gov/2026/TOB/S/PDF/2026SB-00242-R00-SB.PDF |
Loading...