Bill

Bill > AB2505


CA AB2505

CA AB2505
Electrical corporations: hydrogen refueling stations.


summary

Introduced
02/20/2026
In Committee
Crossed Over
Passed
Dead

Introduced Session

2025-2026 Regular Session

Bill Summary

An act to add and repeal Section 740.26 of the Public Utilities Code, relating to energy.

AI Summary

This bill requires electrical corporations, by April 1, 2027, to propose new rules and tariffs to the Public Utilities Commission (PUC), which the PUC must approve by September 1, 2027, allowing these companies to design, build, own, operate, and maintain the electrical infrastructure on the utility side of a customer's meter that is needed to provide separate electrical service to hydrogen refueling stations, even if these stations are located at existing facilities that already receive electricity for other purposes. These new rules will enable electrical corporations to extend their existing electrical systems to a dedicated meter for hydrogen refueling stations, treating the installation costs similarly to other line extensions and allowing the recovery of capitalized costs through general rate cases, with the provisions set to expire on January 1, 2033.

Sponsors (1)

Last Action

From printer. May be heard in committee March 23. (on 02/21/2026)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...