DC B26-0602Guiding Renewable Interconnection and Distribution (GRID) Amendment Act of 2026
summary
Introduced
02/24/2026
02/24/2026
In Committee
03/03/2026
03/03/2026
Crossed Over
Passed
Dead
Introduced Session
26th Council
Bill Summary
A BILL IN THE COUNCIL OF THE DISTRICT OF COLUMBIA To amend the Clean and Affordable Energy Amendment Act of 2008 to guide existing processes for District residents and solar developers on connecting their solar systems to the grid, minimum standards for cost transparency, permitting timelines, and accountability for small generation facilities less than or equal to 20 megawatts, not subject to PJM interconnection requirements, for generating facilities that are designed to operate in parallel with the electric distribution system in the District, and instructs the grid manager to comply with reasonable, uniform, and efficient standards, fees and processes for the interconnection of solar in the District of Columbia.
AI Summary
This bill, the Guiding Renewable Interconnection and Distribution (GRID) Amendment Act of 2026, aims to streamline the process for District residents and solar developers to connect their solar systems to the electric grid, particularly for smaller generation facilities under 20 megawatts that don't fall under PJM interconnection rules. It introduces clearer standards for cost transparency, sets specific timelines for permitting, and establishes accountability for grid managers. Key provisions include defining terms like "Interconnection Customer" (someone applying to connect a solar system), "Grid" (the electric distribution system), and "Small Generator Facility" (equipment used to generate or store electricity that works with the grid). The bill mandates that electric companies provide estimated interconnection costs early in the process, adhere to strict deadlines for reviews and approvals, and offer detailed explanations for any denials. It also establishes an interconnection ombuds office to help resolve disputes and requires electric companies to publish guides and median costs for interconnection on their websites. Furthermore, the bill introduces a cost-sharing mechanism for grid capacity upgrades, with different approaches for primary voltage customers (those receiving power at higher voltages like 4kV or 13kV) and secondary voltage customers (those receiving power at lower voltages like 120V or 240V), and clarifies rules for portable solar generation devices, ensuring they are not subject to mandatory interconnection or net metering unless voluntarily chosen by the owner. Finally, it amends the Renewable Energy Portfolio Standard Act to exclude out-of-District geothermal energy from generating renewable energy credits and sets new criteria for certain air-source renewable energy systems.
Committee Categories
Transportation and Infrastructure
Sponsors (7)
Charles Allen (D)*,
Matt Frumin (D)*,
Janeese George (D)*,
Brianne Nadeau (D)*,
Zachary Parker (D)*,
Brooke Pinto (D)*,
Robert White (D)*,
Last Action
Public Hearing Held (on 03/26/2026)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://lims.dccouncil.gov/Legislation/B26-0602 |
| BillText | https://lims.dccouncil.gov/downloads/LIMS/61310/Introduction/B26-0602-Introduction.pdf |
Loading...