NJ S2473Requires public utility performing road excavation to repave part of road that was excavated if that road had been repaved in previous five years.
summary
Introduced
07/29/2016
07/29/2016
In Committee
07/29/2016
07/29/2016
Crossed Over
Passed
Dead
01/08/2018
01/08/2018
Introduced Session
2016-2017 Regular Session
Bill Summary
This bill requires a public utility, upon completing a project that requires the excavation of a portion of a road that was repaved within the previous five calendar years, to repave or to provide that a contractor repave the road from the portion of the road that was excavated to the bordering curbs and street corners of the road. If the bordering street corners are farther than 150 feet from the portion of road that was excavated, then the public utility is to repave or to provide that a contractor repave 150 feet of road in the direction of each bordering street corner from the excavation site.
AI Summary
This bill requires a public utility, upon completing a project that requires the excavation of a portion of a road that was repaved within the previous five years, to repave or provide for a contractor to repave the road from the excavated portion to the bordering curbs and street corners. If the bordering street corners are more than 150 feet from the excavation, the public utility must repave or provide for the repaving of 150 feet of road in each direction from the excavation site. The term "public utility" is defined as in the existing law, and "road" means a public road, street, or highway.
Committee Categories
Business and Industry
Sponsors (1)
Last Action
Introduced in the Senate, Referred to Senate Economic Growth Committee (on 07/29/2016)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| BillText | https://www.njleg.state.nj.us/2016/Bills/S2500/2473_I1.HTM |
| Bill | https://www.njleg.state.nj.us/2016/Bills/S2500/2473_I1.PDF |
Loading...