Bill

Bill > HR3144


US HR3144

US HR3144
To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes.


summary

Introduced
06/29/2017
In Committee
04/11/2018
Crossed Over
04/26/2018
Passed
Dead
12/31/2018

Introduced Session

115th Congress

Bill Summary

To provide for operations of the Federal Columbia River Power System pursuant to a certain operation plan for a specified period of time, and for other purposes. (Sec. 2) This bill requires the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers to operate the Federal Columbia River Power System (FCRPS) in a manner consistent with the document titled "Endangered Species Act Section 7(a)(2) Supplemental Biological Opinion," dated January 17, 2014, until the later of September 30, 2022, or the date upon which a subsequent final biological opinion for FCRPS operations is in effect with no pending further judicial review. (Sec. 3) Such entities may amend the supplemental opinion and operate the FCRPS accordingly before such date if the entities agree that: (1) the amendments are necessary for public safety or transmission and grid reliability; or (2) the actions, operations, or other requirements that the amendments remove are no longer warranted. (Sec. 4) No structural modification, action, study, or engineering plan may restrict electrical generation at any FCRPS hydroelectric dam or limit navigation on the Snake River in Washington, Oregon, or Idaho unless authorized by Congress.

AI Summary

This bill requires the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers to operate the Federal Columbia River Power System (FCRPS) in a manner consistent with a specific 2014 Endangered Species Act Supplemental Biological Opinion until September 30, 2022, or the date a new final biological opinion is in effect. The agencies may amend the supplemental opinion before that date if they determine the changes are necessary for public safety, grid reliability, or if the original requirements are no longer warranted. The bill also prohibits any structural modifications, actions, studies, or plans that would restrict electrical generation at FCRPS dams or limit navigation on the Snake River without explicit Congressional authorization.

Committee Categories

Agriculture and Natural Resources

Sponsors (9)

Last Action

Received in the Senate and Read twice and referred to the Committee on Environment and Public Works. (on 04/26/2018)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...