Bill

Bill > H4149


MA H4149

Authorizing the city of Haverhill to assess fines for failure to relocate or remove utility poles and wires


summary

Introduced
01/25/2018
In Committee
01/25/2018
Crossed Over
Passed
Dead
12/31/2018

Introduced Session

190th General Court

Bill Summary

That the city of Haverhill be authorized to assess fines for failure to relocate or remove utility poles and wires. Telecommunications, Utilities and Energy. [Local Approval Received.]

AI Summary

This bill authorizes the city of Haverhill to assess fines on utility companies for failure to relocate or remove utility poles and wires within specified timeframes. The bill defines key terms such as "utility company" and outlines the conditions under which the relocation, removal, and installation of utility poles and wires are considered "practical." The bill sets out the fines that can be imposed, ranging from $250 to $1,000 per location per day, depending on the type of violation and the timeline. The bill also grants the city access to information about utility poles and wires and allows the city to assess fines for failure to provide timely notifications about changes to the utility infrastructure. Lastly, the bill establishes a process for utility companies to request exemptions from the provisions of the act.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

Accompanied a study order, see H4684 (on 07/16/2018)

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Loading...