Bill
Bill > A2803
NJ A2803
NJ A2803Directs BPU to study feasibility of adopting certain requirements for installation of new and replacement electric distribution utility poles and transmission towers.
summary
Introduced
02/01/2018
02/01/2018
In Committee
09/24/2018
09/24/2018
Crossed Over
Passed
Dead
01/08/2020
01/08/2020
Introduced Session
2018-2019 Regular Session
Bill Summary
This bill directs the Board of Public Utilities (BPU) to study and prepare and submit, within six months of the effective date of the bill, to the Governor and to the Legislature, a written report making findings and recommendations concerning the feasibility of establishing requirements concerning the installation of new or replacement electric distribution utility poles. The BPU would consider: (1) the feasibility of requiring the installation of concrete, steel, or fiberglass-reinforced composite electric distribution poles; (2) the feasibility of requiring the installation of higher classes of wood electric distribution utility poles than are currently in use; (3) the feasibility of installing higher class or grades of transmission towers than are currently in use; (4) the feasibility of establishing increased height requirements for electric distribution utility poles which support transformers and related distribution infrastructure; and (5) the implementation of standards related to foundation design, embedment depth, and advanced engineering methods for utility pole installation. In conducting the study, the board is directed to: (1) consult with relevant persons and public and private entities in other states that have utilized the types of utility poles, transmission towers, or other standards described in the bill; (2) consider the requirements of the National Electrical Code, the National Electrical Safety Code, and the American National Standards Institute, and other applicable national and international standards; (3) and consider the cost to ratepayers, municipalities, electric public utilities, and the State associated with the implementation of the requirements described in the bill.
AI Summary
This bill directs the Board of Public Utilities (BPU) to study and make recommendations on the feasibility of establishing requirements for the installation of new or replacement electric distribution utility poles and transmission towers. The study will consider the use of concrete, steel, or fiberglass-reinforced composite poles, higher classes of wood poles, higher grades of transmission towers, increased height requirements for poles supporting transformers, and advanced engineering methods for pole installation. The BPU will consult with other states, consider national standards, and evaluate the cost impacts to ratepayers, municipalities, utilities, and the state. The goal is to determine the best types of poles and installation methods to adequately support the electric infrastructure during severe weather events.
Committee Categories
Budget and Finance, Transportation and Infrastructure
Sponsors (3)
Last Action
Reported and Referred to Assembly Appropriations Committee (on 09/24/2018)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| BillText | https://www.njleg.state.nj.us/2018/Bills/A3000/2803_I1.HTM |
| Bill | https://www.njleg.state.nj.us/2018/Bills/A3000/2803_I1.PDF |
Loading...