Requires electric public utility to submit proposal to BPU detailing utility's plan to harden its electric distribution substations to protect against criminal attacks.


summary

Introduced
04/05/2018
In Committee
04/05/2018
Crossed Over
Passed
Dead
01/08/2020

Introduced Session

2018-2019 Regular Session

Bill Summary

This bill requires each electric public utility (utility) in the State having ownership or control of an electric distribution substation to submit a proposal to the Board of Public Utilities (board) for approval detailing the utility's plan to harden its electric distribution substation to protect against criminal attacks. Within 180 days of receipt of a utility's submission of the plan, the board is to determine whether the plan is feasible and whether the plan is to be implemented with or without recommendations. Upon a determination that the plan is feasible and is to be implemented, the board is to order the utility to implement and complete the plan within one calendar year from the date of the order.

AI Summary

This bill requires each electric public utility (utility) in the State having ownership or control of an electric distribution substation to submit a plan to the Board of Public Utilities (BPU) for approval, detailing the utility's plan to strengthen its electric distribution substation infrastructure to protect against criminal attacks. Within 180 days of receiving the utility's plan, the BPU must determine if the plan is feasible and whether it should be implemented with or without recommendations. If the BPU finds the plan feasible and approves it, the utility must implement and complete the plan within one calendar year from the date of the order. Additionally, the bill requires the BPU to adopt rules and regulations establishing electric distribution substation criminal attack prevention standards within 120 days of the bill's effective date.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

Introduced, Referred to Assembly Telecommunications and Utilities Committee (on 04/05/2018)