Bill
Bill > A3100
NJ A3100
NJ A3100Directs BPU to study feasibility of adopting certain requirements for installation of new and replacement electric distribution utility poles and transmission towers.
summary
Introduced
02/24/2020
02/24/2020
In Committee
02/24/2020
02/24/2020
Crossed Over
Passed
Dead
01/11/2022
01/11/2022
Introduced Session
2020-2021 Regular Session
Bill Summary
This bill directs the Board of Public Utilities (BPU) to study and prepare and submit, within six months of the effective date of the bill, to the Governor and to the Legislature, a written report making findings and recommendations concerning the feasibility of establishing requirements concerning the installation of new or replacement electric distribution utility poles. The BPU would consider: 1) the feasibility of requiring the installation of concrete, steel, or fiberglass-reinforced composite electric distribution poles; 2) the feasibility of requiring the installation of higher classes of wood electric distribution utility poles than are currently in use; 3) the feasibility of installing higher class or grades of transmission towers than are currently in use; 4) the feasibility of establishing increased height requirements for electric distribution utility poles which support transformers and related distribution infrastructure; and 5) the implementation of standards related to foundation design, embedment depth, and advanced engineering methods for utility pole installation. In conducting the study, the board is directed to: 1) consult with relevant persons and public and private entities in other states that have utilized the types of utility poles, transmission towers, or other standards described in the bill; 2) consider the requirements of the National Electrical Code, the National Electrical Safety Code, the American National Standards Institute, and other applicable national and international standards; and 3) consider the cost to ratepayers, municipalities, electric public utilities, and the State associated with the implementation of the requirements described in the bill.
AI Summary
This bill directs the Board of Public Utilities (BPU) to study and prepare a report on the feasibility of establishing requirements for the installation of new or replacement electric distribution utility poles and transmission towers. The study will consider the feasibility of requiring the use of concrete, steel, or fiberglass-reinforced composite poles, the use of higher-class wood poles, the installation of higher-class transmission towers, increased height requirements for poles supporting transformers and related infrastructure, and the implementation of standards related to foundation design, embedment depth, and advanced engineering methods. The BPU is required to consult with relevant entities in other states, consider national and international standards, and evaluate the cost to ratepayers, municipalities, electric public utilities, and the State associated with implementing these potential requirements.
Committee Categories
Transportation and Infrastructure
Sponsors (1)
Last Action
Introduced, Referred to Assembly Telecommunications and Utilities Committee (on 02/24/2020)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| BillText | https://www.njleg.state.nj.us/2020/Bills/A3500/3100_I1.HTM |
| Bill | https://www.njleg.state.nj.us/2020/Bills/A3500/3100_I1.PDF |
Loading...