Bill

Bill > S2181


MA S2181

Relative to the failure to remove existing utility poles


summary

Introduced
03/29/2021
In Committee
03/29/2021
Crossed Over
Passed
Dead
12/31/2022

Introduced Session

192nd General Court

Bill Summary

For legislation relative to the failure to remove existing utility poles. Telecommunications, Utilities and Energy.

AI Summary

This bill requires distribution companies or telephone companies that remove an existing utility pole and install a new one to complete the transfer of wires, all repairs, and the removal of the existing pole from the site within 90 days. If the company fails to do so, it must pay a $200 fine to the municipality for every day after the 90-day period. For commercial or industrial construction projects expected to take longer than a year, the company must pay the $200 fine for every day after 6 months that the work is not completed.

Committee Categories

Transportation and Infrastructure

Sponsors (1)

Last Action

Accompanied a study order, see S2715 (on 02/24/2022)

bill text


bill summary

Loading...

bill summary

Loading...

bill summary

Loading...