NJ A3156
NJ A3156Directs BPU to study feasibility of adopting certain requirements for installation of new and replacement electric distribution utility poles and transmission towers.
summary
Introduced
03/07/2022
03/07/2022
In Committee
03/07/2022
03/07/2022
Crossed Over
Passed
Dead
01/08/2024
01/08/2024
Introduced Session
2022-2023 Regular Session
Bill Summary
This bill directs the Board of Public Utilities (BPU) to study and prepare and submit, within six months of the effective date of the bill, to the Governor and to the Legislature, a written report making findings and recommendations concerning the feasibility of establishing requirements concerning the installation of new or replacement electric distribution utility poles. The BPU would consider: 1) the feasibility of requiring the installation of concrete, steel, or fiberglass-reinforced composite electric distribution poles; 2) the feasibility of requiring the installation of higher classes of wood electric distribution utility poles than are currently in use; 3) the feasibility of installing higher class or grades of transmission towers than are currently in use; 4) the feasibility of establishing increased height requirements for electric distribution utility poles which support transformers and related distribution infrastructure; and 5) the implementation of standards related to foundation design, embedment depth, and advanced engineering methods for utility pole installation. In conducting the study, the board is directed to: 1) consult with relevant persons and public and private entities in other states that have utilized the types of utility poles, transmission towers, or other standards described in the bill; 2) consider the requirements of the National Electrical Code, the National Electrical Safety Code, the American National Standards Institute, and other applicable national and international standards; and 3) consider the cost to ratepayers, municipalities, electric public utilities, and the State associated with the implementation of the requirements described in the bill.
AI Summary
This bill directs the Board of Public Utilities (BPU) to study and report on the feasibility of establishing requirements for the installation of new or replacement electric distribution utility poles and transmission towers. The BPU will consider the feasibility of requiring concrete, steel, or fiberglass-reinforced composite poles, higher classes of wood poles, higher class or grades of transmission towers, increased height requirements for poles supporting transformers, and standards for foundation design, embedment depth, and advanced engineering methods. The BPU will consult with relevant entities in other states, consider national and international standards, and evaluate the cost impact to ratepayers, municipalities, utilities, and the state.
Committee Categories
Transportation and Infrastructure
Sponsors (1)
Last Action
Introduced, Referred to Assembly Telecommunications and Utilities Committee (on 03/07/2022)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.njleg.state.nj.us/bill-search/2022/A3156 |
| BillText | https://www.njleg.state.nj.us/Bills/2022/A3500/3156_I1.HTM |
| Bill | https://www.njleg.state.nj.us/Bills/2022/A3500/3156_I1.PDF |
Loading...