Bill

Bill > A5124


NJ A5124

NJ A5124
Amends certain requirements for installation of electric vehicle supply equipment and Make-Ready parking spaces.


summary

Introduced
02/06/2023
In Committee
05/11/2023
Crossed Over
Passed
Dead
01/08/2024

Introduced Session

2022-2023 Regular Session

Bill Summary

Amends certain requirements for installation of electric vehicle supply equipment and Make-Ready parking spaces.

AI Summary

This bill amends certain requirements for the installation of electric vehicle supply equipment (EVSE) and Make-Ready parking spaces. It requires developers or owners of new or reconstructed multiple dwellings with five or more units to prepare at least 15% of the required parking spaces as Make-Ready spaces, with EVSE installed in at least one-third of those spaces initially, and the remaining two-thirds installed within six years. For other parking lots or garages, the bill sets minimum requirements for the installation of Make-Ready spaces based on the total number of parking spaces. The bill also allows parking spaces with EVSE to be counted towards the total required parking, and directs the Site Improvement Advisory Board and the State Uniform Construction Code to incorporate these requirements.

Committee Categories

Agriculture and Natural Resources

Sponsors (4)

Last Action

Substituted by S3490 (2R) (on 12/21/2023)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...