Bill
Bill > S3672
NJ S3672
NJ S3672Requires BPU to establish beneficial building electrification program and requires electric public utilities to prepare and implement building electrification plans.
summary
Introduced
02/28/2023
02/28/2023
In Committee
02/28/2023
02/28/2023
Crossed Over
Passed
Dead
01/08/2024
01/08/2024
Introduced Session
2022-2023 Regular Session
Bill Summary
Requires BPU to establish beneficial building electrification program and requires electric public utilities to prepare and implement building electrification plans.
AI Summary
This bill requires the New Jersey Board of Public Utilities (BPU) to establish a beneficial building electrification program and requires electric public utilities in the state to prepare and implement building electrification plans. The program aims to promote the transition from non-electric to efficient electric equipment and systems, such as heat pumps and induction cooking ranges, to reduce greenhouse gas emissions, lower costs from a societal perspective, and increase off-peak use of the electric grid. The bill sets targets for on-site greenhouse gas emission reductions, establishes program design elements and cost recovery mechanisms, and directs the BPU to develop incentives for electric heat pump installations.
Committee Categories
Business and Industry
Sponsors (2)
Last Action
Senate Environment and Energy Hearing (10:00:00 3/9/2023 Committee Room 10, 3rd Floor, State House Annex, Trenton, NJ) (on 03/09/2023)
Official Document
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
| Document Type | Source Location |
|---|---|
| State Bill Page | https://www.njleg.state.nj.us/bill-search/2022/S3672 |
| BillText | https://pub.njleg.gov/Bills/2022/S4000/3672_I1.HTM |
Loading...