Bill

Bill > HB1046


MD HB1046

Public Utilities - Distributed Generation Certificate of Public Convenience and Necessity


summary

Introduced
02/07/2024
In Committee
02/07/2024
Crossed Over
Passed
Dead
04/08/2024

Introduced Session

2024 Regular Session

Bill Summary

Establishing a distributed generation certificate of public convenience and necessity to authorize the construction and operation of a certain distributed solar energy generating system; requiring the Power Plant Research Program to develop and submit to the Public Service Commission proposed siting and design requirements and licensing conditions; prohibiting a person from being required to obtain a distributed generation certificate of public convenience and necessity until a certain condition is met; etc.

AI Summary

This bill establishes a distributed generation certificate of public convenience and necessity (DGCPCN) to authorize the construction and operation of certain distributed solar energy generating systems. The Power Plant Research Program is required to develop and submit to the Public Service Commission (PSC) proposed siting and design requirements and licensing conditions for the DGCPCN. The PSC must then adopt regulations to implement these standard requirements and conditions. The bill prohibits a person from being required to obtain a DGCPCN until the PSC adopts the necessary regulations, which must be done by July 1, 2025. After that, a person must obtain a DGCPCN before constructing a distributed solar energy generating system.

Committee Categories

Business and Industry

Sponsors (1)

Last Action

House Economic Matters Hearing (13:00:00 3/7/2024 ) (on 03/07/2024)

bill text


bill summary

Loading...

bill summary

Loading...
Loading...