MD HB1046
Public Utilities - Distributed Generation Certificate of Public Convenience and Necessity
summary
Introduced
02/07/2024
02/07/2024
In Committee
02/07/2024
02/07/2024
Crossed Over
Passed
Dead
04/08/2024
04/08/2024
Introduced Session
2024 Regular Session
Bill Summary
Establishing a distributed generation certificate of public convenience and necessity to authorize the construction and operation of a certain distributed solar energy generating system; requiring the Power Plant Research Program to develop and submit to the Public Service Commission proposed siting and design requirements and licensing conditions; prohibiting a person from being required to obtain a distributed generation certificate of public convenience and necessity until a certain condition is met; etc.
AI Summary
This bill establishes a distributed generation certificate of public convenience and necessity (DGCPCN) to authorize the construction and operation of certain distributed solar energy generating systems. The Power Plant Research Program is required to develop and submit to the Public Service Commission (PSC) proposed siting and design requirements and licensing conditions for the DGCPCN. The PSC must then adopt regulations to implement these standard requirements and conditions. The bill prohibits a person from being required to obtain a DGCPCN until the PSC adopts the necessary regulations, which must be done by July 1, 2025. After that, a person must obtain a DGCPCN before constructing a distributed solar energy generating system.
Committee Categories
Business and Industry
Sponsors (1)
Last Action
House Economic Matters Hearing (13:00:00 3/7/2024 ) (on 03/07/2024)
bill text
bill summary
Loading...
bill summary
Loading...
bill summary
Document Type | Source Location |
---|---|
State Bill Page | https://mgaleg.maryland.gov/mgawebsite/Legislation/Details/HB1046?ys=2024RS |
BillText | https://mgaleg.maryland.gov/2024RS/bills/hb/hb1046f.pdf |
Loading...