Bill

Bill > S3308


NJ S3308

NJ S3308
Requires electric public utilities to implement certain improvements to interconnection process for certain grid supply solar facilities and energy storage facilities.


summary

Introduced
05/20/2024
In Committee
12/09/2024
Crossed Over
12/19/2024
Passed
12/19/2024
Dead
Signed/Enacted/Adopted
01/30/2025

Introduced Session

2024-2025 Regular Session

Bill Summary

An Act concerning certain grid supply solar facilities and energy storage facilities and supplementing Title 48 of the Revised Statutes.

AI Summary

This bill requires electric public utilities in New Jersey to improve their interconnection process for grid supply solar facilities and energy storage facilities with a capacity of 20 megawatts or less. The bill mandates that utilities must accept, process, and approve Level 3 interconnection applications (a specific procedure for connecting renewable energy generation facilities to the grid) unless the application is incomplete or the interconnection poses safety or reliability risks. If an application is deemed incomplete, the utility must provide recommendations for improvement, and if safety concerns exist, the utility must suggest modifications to make the interconnection viable. The bill also requires utilities to provide an initial feasibility study within 90 days of receiving a complete application and to extend interconnection facilities using existing infrastructure when possible, with the applicant bearing the cost of extensions. Grid supply solar facilities and energy storage facilities that meet these requirements will be fully eligible for state incentives and will be compensated for electricity supplied to the grid. Additionally, the Board of Public Utilities is required to adopt rules and regulations to implement these provisions within 210 days of the bill's effective date. The overall goal of this legislation is to streamline and facilitate the integration of renewable energy and energy storage facilities into New Jersey's electric grid.

Committee Categories

Agriculture and Natural Resources, Transportation and Infrastructure

Sponsors (7)

Last Action

Approved P.L.2025, c.7. (on 01/30/2025)